Marine Works & Civil Engineering

 

The capability of Ma’agan to perform a large diversity of marine, offshore & port construction works is based on the large diversity of equipment and highly skilled and experienced manpower.

Short List of Capabilities:

  • Port construction & piers rehabilitation
  • Sheet pile walls
  • Anchoring
  • Breakwaters
  • Floating pontoons
  • Mooring systems
  • Offshore pipe laying
  • Shot Crete pier rehabilitation
  • Slope protection
  • Deep foundation piling
  • Crane rails, beams & facilities
  • Desalination Plants

Our innovative competencies are developed continuously and effectively, we provide management and performance with outstanding tools to measure the quality divided by cost and set expectations of future performances too. The certificated comprehensive potential of our experience, together with ISO9001 & ISO14001, is implemented to fully satisfy our customers.

Selected projects

Reconstruction of Key A NorthReconstruction of Key A North

Ordered by:

Israel Shipyards Ltd

 

Project Overview:

The project "Reconstruction of key A North" required the construction of a new key in the length of 210 meters by the use of a 34 meters long combination wal...

More details
Constracting a new marina for 350 yachts in TRNC CyprusConstracting a new marina for 350 yachts in TRNC Cyprus

Ordered by:

Karpaz Bay Marine (KBR)

 

Project Overview:

The project "Construction of a New Marine for 350 Yachts in TRNC Cyprus" required the construction of a brand new Marine, which could occupy 350 yachts. This complicated project included...

More details
Construction of Chemical Terminal One and Two in Haifa PortConstruction of Chemical Terminal One and Two in Haifa Port

Ordered by 

Israel Port Development & Assets Company ltd. (IPC)

 

Project Overview:

The project "Construction of Chemical Terminal One and Two in Haifa Port" required the construction of a new pier in the length of 245 meters, to replace the existing pier which was...

More details
Reinforcement of breakwaters in Tel AvivReinforcement of breakwaters in Tel Aviv

Ordered by

Atarim Tourist Project Development Corp.Tel-Aviv Jaffa Ltd.

 

Project Overview:

Reconstructing of disconnected breakwaters in front of Tel Aviv by adding more then 6,000 ton of rocks that where transfer to the site on special...

More details
Construction of new marine department basin in Haifa portConstruction of new marine department basin in Haifa port

Ordered by:

Port and Railway Authority Haifa Port

 

Project Overview:

The Project "Construction of new marine department basin in Haifa port" requiered a construction of a new key in the length of 175 meters by the use of a 25 meters long combination...

More details
Reconstruction of Key CReconstruction of Key C

Ordered by:
Israel Shipyards Ltd.

 

Project Overview:

The Project "Reconstruction of Key C" consists of the rehabilitation of the existing key between the Kishon pier and pier B of at the Israel shypyard, to enable

More details
PLEM Pile InstallationPLEM Pile Installation

Ordered by:

Petroleum & Energy Infrastructures Ltd. (PEI)

 

Project Overview
The project required the fabrication, delivery and driving of four 20 meters long piles for the purpose of replacing an underwater fuel line in vicinity of the gulf of Haifa in Israel. The project was executed by...

More details
Reconstruction of the fishermanReconstruction of the fisherman's Pier at Acre Port

Ordered by

Ministry of Agriculture and Rural Development


Project Overview

The project "Reconstruction of the fisherman's Pier at Acre Port", consisted of a complete dismantle of the existing pier and construction of an "open" pier build on-top of steel pipes filled with...

More details
Construction of a pier for the Israel Electric Corp. at Haifa portConstruction of a pier for the Israel Electric Corp. at Haifa port

Ordered By:

Israel Electric Corp (IEC)

 

Project Overview:

More details
Development of Ein-Gev Haven, North sideDevelopment of Ein-Gev Haven, North side

Ordered by:

Government Tourist Corporation

 

Project Overview

The project "Development of Ein-Gev Haven, North side", entails the construction of a new pier in the length of 48m, and extension of the boats syncrolift. Moreover, the harbor shall be deepend to -215.5m below...

More details
Support of GADOT South Jetty at Kishon portSupport of GADOT South Jetty at Kishon port

Ordered by

Israel Port Development & Assets Company ltd. (IPC)

 

Project Overview:

The project "Support of GADOT South Jetty at Kishon port" required MAAGAN to supply and install 40 steel pipes in the diameters of 14 " , 24" , 26 " , 28" and in the length of 24 meters on both sides of the....

More details
On-site dynamic load test for existing concrete pilesOn-site dynamic load test for existing concrete piles

MAAGAN performs dynamic load tests by dropping a weight of different values ​​at different heights on an existing pole. Load sensors are situated on the pile and are measuring the...

More details
Reconstruction of the EAST pier at Haifa portReconstruction of the EAST pier at Haifa port

Ordered by

Israel Port Development & Assets Company ltd. (IPC)

 

Project Overview:


The project "Reconstruction of the EAST pier at Haifa port", is a project to rehabilitate and strengthen the pier along 964 meters; this, to align it with the original planning and new...

More details
Construction of a new pier between Cargo pier to PEI fuel pierConstruction of a new pier between Cargo pier to PEI fuel pier

Ordered by
Israel Port Development & Assets Company ltd. (IPC)



Project Overview:

The Project "Construction of a new pier between Cargo pier to PEI fuel pier", consists the construction of a new 90m long pier which is meant to replace the existing pier due to its...

More details
construction of a buffer battery wall at dead sea ponds 5-8construction of a buffer battery wall at dead sea ponds 5-8

Ordered by

Dead Sea Works

 

Project Overview

The Project "construction of a buffer battery wall at dead sea ponds 5-8", has been executed to construct a sealed sheet-pile wall in the length of 170m to lengthen the pond, by driving Larsen 607n sheet-piles. Before the piles were...

More details
Ground Stabilization of the passenger hall in Haifa PortGround Stabilization of the passenger hall in Haifa Port

Ordered by:

Israel Port Development & Assets Company ltd. (IPC)

 

Project Overview:

Maagan is the awarded contractor selected to perform The "Ground Stabilization of the passenger hall in Haifa Port" (DUTYFREE). Work is being executed by the use of hollow...

More details

Current projects

Reconstruction and rehabilitation of docks 1-6 at Haifa portReconstruction and rehabilitation of docks 1-6 at Haifa port

Ordered by
Israel Port Development & Assets Company ltd. (IPC)

 

Project Overview:

The project "Reconstruction and rehabilitation of docks 1-6" at Haifa port, consists of rehabilitating docks 1-4 with an approximate length of 600 meters, and reconstruction of docks 5-6 with...

More details
Construction of "HAMIFRATZ" PortConstruction of "HAMIFRATZ" Port

 

Project Overview:

The Project "Construction of HAMIFRATZ port", is the construction of a brand new fully operational private port, adjacent to the existing Haifa Port. Maagan has been awarded as the main sheet-pile contractor, in-charge of...

More details